Full Rig Inspection

To make full inspection to the rig parts / equipment according to :

• API 4F

Specification for Drilling and Well Servicing Structures.

• API 4G

Operation, Inspection, Maintenance, and Repair of Drilling and Well Servicing Structures.

• API ​5D

Specification for Drill Pipe

• API ​7K

Drilling and Well Servicing Equipment

• API ​​8A

Specification for Drilling and Production Hoisting Equipment.

• API RP 8B

Recommended Practice for Procedures for Inspections, Maintenance,Repair and Remanufacture of Hoisting Equipment.

• API 8C

Drilling and Production Hoisting Equipment (PSL 1 and PSL 2)

• API ​​9A

Specification for Wire Rope

• API RP 7G -2

Specification for Control Systems for Drilling Well Control Equipment and Control Systems for Diverter Equipment.

• API ​spec 7

Specification for Rotary Drill Stem Elements

• ASTM E 213

Standard Practice for Ultrasonic Examination of Metal Pipe Tubing.

• ASTEM 317

Standard Practice for Evaluating Performance Characteristics of Ultrasonic Pules-Echo Testing Systems Without the Use of Electronic Measurement Instruments.

• ASTM E 570

Standard Practice for Flux Leakage Examination of Ferro Magnetic Steel Tubular Product.

• ASTM E 709

Standard Guide for Magnetic Particle Inspection.

• ASTM E 1316

Standard Terminology for Non Destructive Examination.

• ASTM E 1324

Standard Guide for Measuring Some Electronic Characteristics of Ultrasonic Examination Instruments.

• ASTM E 1359

Standard Guide for Evaluating Capabilities of Non Destructive Testing Agencies.

• ASTM E 1065

Standard Guide for Evaluating Characteristics of Ultrasonic Search Units.

• ASTM RP 8B

Hoisting Equipment.

• DS -1™

TH Hill Standard Drill Stem Design and Inspection.

• EMQSP 6.9

Company Full-Length Pipe Body Inspection.

• ISO TS 29001

Petroleum, Petrochemical and Natural Gas Industries – Sector Specific Quality Management Systems Requirements for product and Service Supply Organizations.

• ISO 4309 & 4310

Crane-Teat Code and Procedures crane-wire rope-Care and Maintenance

• ISO 9927-1&3

Crane-Inspection - Part 1

• BSI

British Standard Inspection.

• NS-2

Drill String Inspection Standard , Fernley Proctor Group.

• IEC 60079-10-1 ed1.0 (2008-12)

TC/SC 31J Explosive atmospheres - Part 10-1: Classification of areas Explosive gas atmospheres.

• IEC 60079-10-2 ed2.0 (2015-01)

TC/SC 31J Explosive atmospheres - Part 10-2: Classification of areas Explosive dust atmospheres.

• IEC 60079-14 ed5.0 (2013-11)

TC/SC 31J Explosive atmospheres - Part 14: Electrical installationsdesign,selection and erection.

• IEC 60079-17 ed5.0 (2013-11)

TC/SC 31J Explosive atmospheres - Part 17: Electrical installations inspection and maintenance .

Rig Inspection Parts

    1- Crown Block and Water Table 
    2- Cat line Boom and Hoist Line 
    3- Drilling Line 
    4- Monkey board 
    5- Traveling Block 
    6- Top Drive 
    7- Mast 
    8- Drill Pipe 
    9- Doghouse 
    10- Blowout Preventer 
    11- Water Tank 
    12- Electric Cable Tray 
    13- Engine Generator Sets 
    14- Fuel Tanks 
    15- Electric Control House 
    16- Mud Pump

17- Bulk Mud Components Storage
18- Mud Pits
19- Reserve Pits 
20- Mud Gas Separator 
21- Shale Shaker 
22- Choke Manifold 
23- Pipe Ramp 
24- Pipe Racks 
25- Accumulator 
26- Annulus 
27- Brake Bands 
28- Casing Head 
29- Cathead 
30- Catwalk 
31- Cellar 
32- Conductor Pipe